NewBattery Regulation 2027 compliance pack is live.Read
DPP Automate LogoDPP Automate
Case studies

Engagement patterns from regulated industries.

Industry scenarios distilled from our DPP delivery methodology. Named customer studies publish as launch partners go live — apply to be the first.

  • 6 industry verticals
  • EU-grade methodology
  • Launch pioneer program
Pre-launch — scenarios based on delivery methodology
Featured engagement
Battery Reg 2027

Battery cell manufacturer

Multi-tier supply chain visibility for cell chemistry, carbon footprint, and state-of-health data — 18 months until the February 2027 EU 2023/1542 deadline.

Production-ready passport issuance across 11 tier-1 suppliers in 4 countries, with verifiable attestations on every cell and an end-to-end audit trail from raw material to deployed pack.

Engagement:6-week onboarding11 tier-1 suppliers wired4 countries audited
Outcome
2.3M
cells/year covered
Outcome 02
11
tier-1 suppliers wired
Outcome 03
4
countries audited

Every engagement, in one place.

6 scenarios
Battery Reg 20276-week onboarding

Battery cell manufacturer

Challenge

Multi-tier supply chain visibility for cell chemistry, carbon footprint, and state-of-health data — 18 months until the February 2027 EU 2023/1542 deadline.

Outcome

Production-ready passport issuance across 11 tier-1 suppliers in 4 countries, with verifiable attestations on every cell and an end-to-end audit trail from raw material to deployed pack.

2.3M
cells/year covered
11
tier-1 suppliers wired
4
countries audited
ESPR textileSub-2-week SKU cycle

Fashion & apparel brand

Challenge

300+ SKU/year cadence with seasonal collections; passport required at SKU level without slowing the design-to-shelf cycle (EU 2024/1781 textile delegated act).

Outcome

PIM-integrated passport issuance with 95% data-field auto-population from the existing product master and live preview inside the merchandising tool.

300+
SKUs/year, no slowdown
95%
fields auto-populated
<2wk
creation to live passport
ESPR electronics8-week consolidation

Consumer electronics OEM

Challenge

12 product lines across audio, wearables, and smart home — each with different repair-score, recycled-content, and energy-disclosure obligations under ESPR.

Outcome

Unified passport template library covering all 12 lines, per-product variation handled via field-level overrides, and a single audit interface for the compliance team.

12
product lines unified
1
audit pane, all SKUs
100%
ESPR fields mapped
PPWR12-week multi-site rollout

CPG packaging operator

Challenge

Cross-EU packaging footprint, recyclability data per material, and deposit-return scheme reporting in seven markets under PPWR (EU 2025/40).

Outcome

Unified packaging DPP across 14 production sites with ERP-linked material composition and automated DRS reporting for FI/DE/SE/NL/EE/LT/HR.

14
production sites unified
7
DRS markets automated
100%
ERP-linked composition
Cross-cutting4-week first passport

Mid-market platform engagement

Challenge

Legacy SAP plus Akeneo PIM — DPP needed without forcing a re-platform or extending a 14-month IT roadmap that was already locked.

Outcome

Read-only connectors to both systems, zero schema changes required, first passport issued 4 weeks after kickoff and full coverage in 12 weeks.

0
schema changes required
4wk
to first live passport
12wk
to full coverage
Toys Safety Reg5-week launch

Toy manufacturer — EU launch

Challenge

EU market entry from a non-EU manufacturing base; full DPP plus economic-operator declaration per SKU plus CE marking trail under the revised Toys Safety Regulation.

Outcome

Combined passport + economic-operator workflow, multi-language product data (EN/DE/FR/IT/ES/PL), nine SKUs launched in five weeks.

9
SKUs launched
6
EU languages live
5wk
kickoff to first sale
Launch pioneer program

Be the named case study.

We are selecting a small group of launch partners to ship live DPPs with us. Pioneer engagements get a published case study, locked launch pricing, and a direct line to the product team.

  • Featured published case study
  • 12-month launch pricing locked
  • Direct line to the product team
How we engage

Four steps from kickoff to live passport.

Every scenario above follows the same four-step delivery rhythm. We scope tight, wire data once, ship a real passport early, then scale.

Scoping

Regulation read, product-family scope, data-source inventory. One workshop, one signed scope.

Data wiring

Read-only connectors to ERP and PIM. No schema changes, no re-platforming, no IT roadmap extension.

First live passport

A single real passport, end-to-end, signed and audit-ready. The whole stack proven on one SKU before scale.

Production rollout

Template library, supplier portal, audit interface. From one passport to your full catalogue in weeks, not quarters.